May 06, 2023     38-3 Beringer Brake System Re-Routing - (4 hours)       Category: Brake System
Tested different alternatives for the Beringer routing. I didn't like the routing below the cylinder and checked a different configuration having both lines going in parallel in front. I checked on the web and there are only few using this setup. Majority uses the recommended routing (both VANS and Beringer) with the lines going behind the cylinder.
I went back to this approach, changing a bit the tying position (three zip ties for the hose behind the cylinder) in order to minimize the movement. now it looks pretty solid. It is not final yet.
I decide to install three nutplates instead of the initial set-up with classic bolt and nut. Reason being that once the fuselage forward top cover will be riveted maintenance will be easier with the nutplates instead of the normal bolt/nut.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.